Section 23 05 00:  Common Work Results for HVAC

    1. HEATING AND COOLING LOAD CALCULATIONS
    2. BUILDING ENVELOPE REQUIREMENTS
    3. WATER SYSTEM REQUIREMENTS
    4. WATER SYSTEM LEAKAGE PREVENTION
    5. CHILLED WATER SYSTEMS
    6. HEATING WATER SYSTEM
    7. CONDENSER WATER SYSTEM
    8. LABELING AND IDENTIFICATION
    9. PIPING
    10. AIR SYSTEM REQUIREMENTS
    11. EQUIPMENT ACCESS AND LOCATION
    12. SOUND AND VIBRATION
    13. SEISMIC REQUIREMENTS
    14. VARIABLE SPEED/FREQUENCY DRIVES
    15. BELT DRIVES
    16. ELECTRIC MOTORS
    17. BEARINGS
    18. WEATHER PROTECTION
    19. EQUIPMENT SELECTIONS
    20. UNIVERSITY PREFERRED HVAC EQUIPMENT AND STOCKED PARTS
    21. MEDIA ACCESS CONTROL ADDRESS
    22. AIR AND WATER BALANCING
    23. PIPING MATERIALS
    24. MANUFACTURERS
    25. FUEL BURNING EQUIPMENT – PARTICULATE EMISSIONS

Section 23 07 13:  Duct Insulation

    1. REQUIREMENTS
    2. MATERIALS
    3. EXPOSURE
    4. SERVICE
    5. PIPING
    6. DUCTWORK
    7. EQUIPMENT

Section 23 11 00:  Facility Fuel Piping

    1. GENERAL
    2. MATERIALS

Section 23 20 00:  HVAC Piping, Pumps, Chillers, and Cooling Towers

    1. CHILLERS
    2. COOLING TOWERS
    3. PUMPS
    4. PUMP SUCTION DIFFUSERS
    5. EXPANSION TANKS
    6. STRAINERS
    7. WATER FLOW MEASURING STATIONS
    8. AIR SEPARATORS
    9. TEST PORTS
    10. WATER TREATMENT
    11. PIPING
    12. QUALITY ASSURANCE
    13. ROUTING
    14. LAYOUT
    15. CONNECTIONS TO EQUIPMENT
    16. THERMAL EXPANSION
    17. VENTING AND DRAINING
    18. HANGERS AND SUPPORTS
    19. SECTION VALVES
    20. MATERIALS
    21. CLEANING AND TESTING
    22. DIRECT BURIED PIPING
    23. DUCTWORK

Section 23 30 00:  HVAC Air Distribution

    1. DUCT DESIGN
    2. ROTATING EQUIPMENT
    3. DUCT SEALING
    4. DUCT PRESSURE TESTING
    5. DUCTWORK CONFIGURATION
    6. ZONING
    7. DUCT LAYOUT
    8. LABELING
    9. VARIABLE AIR VOLUNTE (VAV) SYSTEMS

Section 23 60 00:  HVAC Air Distribution

    1. GENERAL REQUIREMENTS
    2. SUPERVISION AND EXECUTION